Industries Education

Industries
Education

Why Cpac Modular?

We have vast experience in the design and construction of Schools and Education Facilities across Ireland. Indeed, every year our modular buildings are used to create enough classrooms to teach over 4,000 pupils.

We understand your requirements for your Primary School, Secondary School, or College buildings and the needs of both staff and pupils for a modern, functional, and comfortable working/learning environment.

Unlike many other suppliers, we have a full in-house team of professional designers, specifiers, project managers and manufacturing and construction experts to ensure the design, planning, offsite build and onsite assembly of your School or Education Facility runs smoothly.

From single rooms to two or three-story blocks, teachers lounges, examination areas, gyms, kitchens, classrooms, canteens, and offices.

Why Cpac Modular?
Industry Solutions

Industry Solutions

Permanent

A New Horizon in Modular Construction Coming 2022.

Hybrid

Cpac Modulars’ Hybrid Modular is the next generation of high-speed off-site construction.

Temporary

Cpac Modulars’ temporary modular solutions to your facilities needs.

Education Industry Case Study

Griffeen Community College

Griffeen Community College

A Hybrid Modular School

Situated next to a new modern three-storey school, this project required a solution with a complementary look and feel to the existing school. “Grey Box” style pre-manufactured classrooms were simply not on the table from a user or planning perspective.

The Challenge & Goal

The Challenge & Goal

Griffeen Community College was designed and built with the end user requirements to the forefront of our consideration. Teaching and circulation spaces exceed DoES minimum guidelines, providing ideal learning spaces for students and teachers.

Accessibility for both ambulant disabled and disabled pupils and staff was designed in at an early stage ensuring facilities such as lifts, ambulant disabled compliant stairs, adequate space for wheelchair turning in rooms and corridors, braille signs on doors, and an induction hearing loop system in the reception area.

The Solution

Our Cpac Hybrid Modular space was built off-site and delivered in 4 days on a live campus environment that suited all stakeholders. Architecturally designed to the highest specification with the look and feel of a ground-up build; this project stands as a best in class example of what modern school space provision can be.

  • 40 sections installed in 4 days
  • 11 classrooms over 2 storeys
  • 530 sq m (11,328 sq ft) completed school building

“Our new school is built with a Cpac Hybrid Modular process and for us that means a greener, stronger and faster build with all the architectural design and feel of a traditional build..”

Griffeen Community College
CPAC

Chat with an Advisor today?

Martin Murray

Sales and Business Development Manager

To contact Martin for any sales or project
enquiries please email him at
martin.murray@cabinpac.ie or call 087 390 0274

Get In Touch Today & Download Our Guide

Get In Touch Today & Download Our Guide

    [cf7_download_guide_file]

    Let our expert consultants advise you on the perfect solution for your next project

    Get in Touch